Japanese shipping company Mitsui O.S.K. Lines (MOL) and US-based Chevron Shipping Company will integrate the state-of-the-art wind-powered propulsion system into the LNG (liquefied natural gas) vessel. According to the companies, It will be the world's first LNG ship with wind-powered technology. The 174,000 cubic meter vessel, chartered by Chevron Asia Pacific Shipping, is being built in South Korea. 2026 It is planned to be delivered in the year.
Developed by MOL Wind Challenger Telescopic sails in the named technology, the ship's reducing fuel consumption It will also reduce greenhouse gas emissions. According to the company, the technology combines automatic sail control with a real-time wind monitoring system to improve fuel efficiency.
Weight saving with composite material
Sails, light weight to maintain the cargo capacity of the ship fibre glass reinforced plastic (GFRP) is manufactured. There is not a lot of weight on the ship. Sails also to maintain balance in choppy weather It can shrink down. In this way, the center of gravity is pulled down, providing the same security as traditional ships.
Wind Challenger combines three key components to optimize ship routes and further improve fuel efficiency: sails, control system and weather route.
In fuel consumption %Up to 17 ⁇ reduction achieved
In October 2022, MOL launched Shofu Maru ⁇ yu, a 100,000-metric-tonne coal carrier equipped with Wind Challenger. The ship has completed 7 round trips for 18 months and is in daily fuel consumption. %A reduction of up to 17 ⁇ He got and Average per voyage %From 5 to %A reduction of 8 was achieved.
The company says the Wind Challenger system can be fitted to both newly built and existing vessels, from dry cargo ships to tankers and LNG carriers. can be mounted on various ships more than once He says it. MOL plans to launch 25 ships equipped with Wind Challenger technology by 2030 and another 25 by 2035. of 80 ships. He plans to deploy.

